Jan 14, 2019 | Additions, blog, R. Craig Lord Construction
The Front Exterior The closing in or completion of the exterior is an important milestone for any project, but in the winter with the threat of bad weather it is even more important. At our Addition in Moorestown, NJ, the team at R. Craig Lord Construction is...
Jan 11, 2019 | Additions, blog, Moorestown, R. Craig Lord Construction
R. Craig Lord Construction’s two-story addition is moving along at a steady pace in Moorestown, NJ as the second floor and roof is framed. This is an exciting time in an Addition project as the form of the Addition takes shape and the homeowners can see, in...
Dec 13, 2018 | Additions, blog, R. Craig Lord Construction
Moving right along on Riverton Road! With the foundation complete, R. Craig Lord Construction has begun the first floor framing of this soon to be two-story addition in Moorestown, NJ. Wood beams were bolted to the cement foundation and a 3/4″ tongue and groove...
Nov 28, 2018 | blog, Design-build, kitchen remodel, R. Craig Lord Construction
R. Craig Lord Construction traveled down the shore with our Moorestown clients, Pat and Angela C., to remodel their shore house in Margate, NJ. The exterior remodel included new siding, entry way, stonework, windows, and a roof. This stunning transformation created an...
Nov 27, 2018 | blog, Events
Nov 27, 2018 | blog, construction
Home Maintenance Tips from R. Craig Lord Construction’s Lead Carpenter Gary Wuchter Reverse your ceiling fans in winter. If your ceiling fan has a reverse switch, use it to run the fan’s blades in a clockwise direction after you turn on your heat. The fan will...