Feb 18, 2019 | Additions, blog, Moorestown, R. Craig Lord Construction
After months of framing, R. Craig Lord Construction’s two-story addition in Moorestown, NJ continues to the drywall stage and the addition of doors to access the new spaces from the main house. The photo below shows the new doorway from the upstairs of the main...
Feb 18, 2019 | Additions, blog, Moorestown, R. Craig Lord Construction
The interior walls are framed in this Moorestown, NJ Addition, and it’s exciting as the home owners can walk through the space and see the physical layout that was once just a floorplan and 3D model. The interior walls were built from 2-by-4 wall studs and framing,...
Jan 14, 2019 | Additions, blog, R. Craig Lord Construction
The Front Exterior The closing in or completion of the exterior is an important milestone for any project, but in the winter with the threat of bad weather it is even more important. At our Addition in Moorestown, NJ, the team at R. Craig Lord Construction is...
Jan 11, 2019 | Additions, blog, Moorestown, R. Craig Lord Construction
R. Craig Lord Construction’s two-story addition is moving along at a steady pace in Moorestown, NJ as the second floor and roof is framed. This is an exciting time in an Addition project as the form of the Addition takes shape and the homeowners can see, in...
Dec 13, 2018 | Additions, blog, R. Craig Lord Construction
Moving right along on Riverton Road! With the foundation complete, R. Craig Lord Construction has begun the first floor framing of this soon to be two-story addition in Moorestown, NJ. Wood beams were bolted to the cement foundation and a 3/4″ tongue and groove...
Nov 19, 2018 | Additions, blog, Moorestown
Moorestown is a great historic town with charm and character and homeowners tell us they want to stay, even when thier home is busting at the seams. Sometimes a beloved home just needs a little more space! An addition is a perfect solution. R. Craig Lord...